Laserfiche WebLink
Hydrologic <br />Element <br />Drainage Area <br />(M12) <br />Peak Discharge <br />(CFS) <br />Time of Peak <br />Volume <br />(AC -FT) <br />J1 <br />0.1662 <br />66.1 <br />01Jan2010, 12:21 <br />6.0 <br />J2 <br />0.1504 <br />62.8 <br />01Jan2010, 12:16 <br />5.5 <br />J3 <br />0.0434 <br />22.3 <br />01Jan2010, 12:10 <br />2.0 <br />J4 <br />0.1304 <br />56.2 <br />01Jan2010, 12:10 <br />4.8 <br />Outlet <br />0.1662 <br />66.1 <br />01Jan2010, 12:21 <br />6.0 <br />Reach 1 <br />0.1504 <br />62.5 <br />01Jan2010, 12:21 <br />5.4 <br />Reach -2 <br />0.1304 <br />56.0 <br />01Jan2010, 12:16 <br />4.7 <br />Reach -3 <br />0.0434 <br />22.2 <br />01Jan2010, 12:12 <br />2.0 <br />Reach -4 <br />0.0410 <br />19.9 <br />01Jan2010, 12:11 <br />1.4 <br />Subbasin -1 <br />0.0158 <br />6.4 <br />01Jan2010, 12:09 <br />0.6 <br />Subbasin -2 <br />0.0200 <br />7.1 <br />01Jan2010, 12:12 <br />0.7 <br />Subbasin -3 <br />0.0434 <br />22.3 <br />01Jan2010, 12:10 <br />2.0 <br />Subbasin -4 <br />0.0460 <br />16.5 <br />01Jan2010, 12:06 <br />1.4 <br />Subbasin -5 <br />0.0410 <br />20.1 <br />01Jan2010, 12:03 <br />1.4 <br />Project: Phase 2 Simulation Run: 25 -yr 24 -hr <br />Start of Run: 01Jan2010, 00:00 Basin Model: CCV Phase 2 <br />End of Run: 02Jan2010, 00:01 Meteorologic Model: 25 -yr 24 -hr Storm <br />Compute Time: 24Jun2011, 11:37:06 Control Specifications: Control 1 <br />Volume Units: AC -FT <br />