Laserfiche WebLink
Hydrologic <br />Element <br />Drainage Area <br />(M12) <br />Peak Discharge <br />(CFS) <br />Time of Peak <br />Volume <br />(AC -FT) <br />J1 <br />0.33828 <br />108.3 <br />01Jan2010, 12:23 <br />12.1 <br />J2 <br />0.26928 <br />93.6 <br />01Jan2010, 12:18 <br />9.6 <br />J3 <br />0.04340 <br />26.5 <br />01Jan2010, 12:06 <br />2.0 <br />J4 <br />0.18470 <br />70.4 <br />01Jan2010, 12:14 <br />6.5 <br />Outlet <br />0.33828 <br />108.3 <br />01Jan2010, 12:23 <br />12.1 <br />Reach 1 <br />0.26928 <br />92.1 <br />01Jan2010, 12:23 <br />9.6 <br />Reach -2 <br />0.18470 <br />70.0 <br />01Jan2010, 12:18 <br />6.5 <br />Reach -3 <br />0.04340 <br />26.4 <br />01Jan2010, 12:12 <br />2.0 <br />Reach -4 <br />0.06500 <br />30.6 <br />01Jan2010, 12:17 <br />2.2 <br />Subbasin -1 <br />0.06900 <br />25.8 <br />01Jan2010, 12:11 <br />2.5 <br />Subbasin -2 <br />0.08458 <br />35.3 <br />01Jan2010, 12:08 <br />3.2 <br />Subbasin -3 <br />0.04340 <br />26.5 <br />01Jan2010, 12:06 <br />2.0 <br />Subbasin -4 <br />0.07630 <br />27.6 <br />01Jan2010, 12:06 <br />2.3 <br />Subbasin -5 <br />0.06500 <br />31.0 <br />01Jan2010, 12:04 <br />2.2 <br />Project: Phase 1 Simulation Run: 25 -yr 24 -hr <br />Start of Run: 01Jan2010, 00:00 <br />End of Run: 02Jan2010, 00:01 <br />Compute Time: 21 Jan2011, 14:39:44 <br />Volume Units: AC -FT <br />Basin Model: CCV Phase 1 <br />Meteorologic Model: 25 -yr 24 -hr Storm <br />Control Specifications: Control 1 <br />