Laserfiche WebLink
Cripple Creek and Victor <br />Phase 1 VLF <br />Lag Time Calculation Using Natural Resources Conservation Service TR -55 <br />Watershed Contribution Area 4 <br />Sheet Flow <br />Mannings n = 0.24 <br />Flow Length (ft, max 300 ft) = 300 <br />24 hr Rainfall, P2 (in) = 1.8 <br />Land Slope, s (ft/ft) = 0.583 <br />Tt (hr) = 0.198 <br />Tt (min) = 11.9 <br />Shallow Concentrated Flow <br />Flow Length, L (ft) = 2550 <br />Watercourse Slope ( ft/ft) = 0.360 <br />Average Velocity, V (ft/sec, fig 3 -1) = 9 <br />Tt (hr) = 0.079 <br />Tt (min) = 4.7 <br />Channel Flow <br />Cross Sectional Flow Area, a (ft = 56 <br />Wetted Perimiter, p„ (ft) = 25.5 <br />Hydraulic Radius, r = alp„ (ft) = 2.20 <br />Channel Slope, s (ft/ft) = 0.05 <br />Manning's n = 0.035 <br />V ( ft/sec) = 16.08 <br />Flow Length, L (ft) = 1021 <br />Tt (hr) = 0.018 <br />Tt (min) = 1.1 <br />Watershed or subarea Tc = <br />Lag time (hr) _ <br />Lag time (min) = <br />0.295 <br />0.177 <br />10.60 <br />T _ 0.007 (nl) °-8 <br />P 2 0.s <br />L <br />T = <br />3 600 V <br />1.49 r2i3 <br />V = <br />n <br />L <br />T - <br />` 3600 V <br />