My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-01_REPORT - M1989009
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1989009
>
2012-02-01_REPORT - M1989009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:48:15 PM
Creation date
3/15/2012 7:15:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989009
IBM Index Class Name
REPORT
Doc Date
2/1/2012
Doc Name
Annual Fee/Report Notice
From
DRMS
To
J-Rude, Inc.
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Annual Re ort <br />According to C.R.S. 34 -32.5 -116 or 34 -32 -116, each year, on the anniversary date of th <br />submit the annual fee, an annual report and map showing the extent of current disturbances <br />required monitoring information, reclamation accomplished to date and during t e permit, an operator shall <br />disturbance that is anticipated to occur during the any reclamation to affected land, <br />is rbamin e upcoming year, g h tha wi ll preceding b y any performed during <br />dates for the beginning of active operations, and the date active operations ceased ceased during <br />year, if any. <br />the year, the d for the <br />Information contained in this report will be reviewed by the Division upon receipt and <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance <br />and the act, it is advisable that the issues be rectified promptly to avoid ossi p prior to the next compliance <br />mn <br />1. Is the site identification sign posted in accordance with Rule p ble enforcement t actioo n. . the rules <br />3.1.12(1) <br />YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12 ( 2 ) <br />3. Is the mine site in final reclamation (all material extraction and YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />removal is complete)? YES NO <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more or less than 180 days per year? <br />If "LESS ", please review Rule 1.13 to assure that your mine is in compliance. <br />MORE LESS <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? Y ES NO <br />YES NO <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) <br />8. Number of acres that were newly affected during the current report ear. <br />Y <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />seeded w/ <br />a•proved mix: <br />Total acres <br />fertilized w/ <br />a • vd fertilizer: <br />Fertilizer <br />application <br />method: <br />Mulch application <br />rate (tons): <br />
The URL can be used to link to this page
Your browser does not support the video tag.