Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company Squaw Gulch Valley Leach Facility Design <br />C.7 Squaw Gulch VLF PSSA Embankment Settlement Calculations <br />C.8 High Volume Solution Collection Piping Calculations <br />C.9 Underdrain Calculations <br />D Assessment of Underground Workings within Limits of Valley Leach Facility <br />D.1 Golder Historic Mine Workings Investigation (2007) <br />D.2 SWC Squaw Gulch VLF Field Reconnaissance <br />E Squaw Gulch VLF Slope Stability Results <br />E.1 Infinite Slope Analysis <br />E.2 Global Slope Stability <br />F Surface Water Hydrology <br />F.1 Letter to OLMR Pertaining to SCS Runoff Curve Numbers <br />F.2 Output from Surface Water Hydrology Models <br />G Water Balance Model <br />G.1 VLF Water Balance Model <br />G.2 Meteorological Data and Precipitation Modeling <br />H Technical Specifications <br />Filtered Tailings Storage Considerations <br />Project No.: 74201125G0 iv <br />1 September 2011 <br />amec0 <br />