Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company Squaw Gulch Valley Leach Facility Design <br />7.0 WATER BALANCE 36 <br />7.1 Water Balance Model 36 <br />7.2 System Analysis 37 <br />7.2.1 System Inflow Evaluation 37 <br />7.2.2 System Outflow Evaluation 38 <br />7.2.3 Contingency Inflows 38 <br />7.3 Discussion of Results 38 <br />8.0 USE OF THIS REPORT 40 <br />9.0 REFERENCES 41 <br />TABLES <br />Table 1 <br />Table 2 <br />Table 3 <br />Table 4 <br />Table 5 <br />Table 6 <br />FIGURES <br />Figure 1 <br />Figure 2 <br />Figure 3 <br />Figure 4 <br />Figure 5 <br />Figure 6 <br />DRAWINGS <br />Statistical Precipitation Data <br />Cresson Project Evaporation Data <br />SWC Laboratory Test Data Summary, Squaw Gulch VLF Geotechnical Investigation <br />AMEC Laboratory Test Data Summary, Squaw Gulch VLF Geotechnical Investigation <br />Slope Stability Analyses Squaw Gulch VLF <br />Squaw Gulch VLF Operations Hydrologic Parameters and Hydraulic Structure Sizing <br />Squaw Gulch VLF Ultimate Ore Configuration <br />Squaw Gulch VLF Cross - Sections <br />Passive Closure Underdrain System <br />PSSA Water Balance Model Results: Volume vs Time <br />PSSA Water Balance Model Results: Elevation vs Time <br />Cresson Ore Load - Porosity Relationship <br />VLF Title Sheet <br />A020 Existing Site Conditions <br />A040 Site Geology Map <br />A060 Historic Underground Workings <br />A080 Soil Liner Fill Borrow Area <br />A100 Ultimate Ore Configuration <br />A150 Valley Leach Facility Cross Sections <br />A200 Overburden Storage Area & Future Mill Platform Grading <br />A201 Overburden Storage Area & Future Mill Platform Grading <br />Sheet 1 of 2 <br />A202 Overburden Storage Area & Future Mill Platform Grading <br />Sheet 2 of 2 <br />A205 Phase 1 Squaw Gulch Grading Plan <br />A207 PSSA Embankment Layout <br />A210 Phase 2 Squaw Gulch Grading Plan <br />A215 Overall Liner Limits <br />A220 Valley Leach Facility Section and Details Sheet 1 of 2 <br />A230 Valley Leach Facility Section and Details Sheet 2 of 2 <br />A250 Underdrain Details 1 of 2 <br />A255 Underdrain Details 2 of 2 <br />A260 Leak Detection and Typical Erosion Control Details <br />Project No.: 74201125G0 <br />1 September 2011 <br />Plan <br />Sections and Details <br />Sections and Details <br />amec0 <br />