Laserfiche WebLink
Item No. 4 — NCC does monitor the wells on a weekly basis. As per Technical Revision No. 3 it was <br />determined that 1000 gpm would be required in the recharge ditch. During the weekly monitoring of <br />the wells if NCC determines that we have reached 75% of the upper or lower limits using the 24 inch <br />basis below or above the standard deviations established we will begin to either increase or decrease <br />the flow as conditions warrant. This should allow time to stabilize the water table before moving <br />outside of the 24 inch below the established baseline for each of the monitoring wells. <br />Item No. 5 — NCC is currently monitoring the wells on a weekly bases and will continue to do so in <br />the future. NCC will commit to submitting the weekly monitoring data with our Annual Report. <br />NCCI appreciates your consideration of our responses to your letter dated May 20, 2011. <br />Please contact me with any questions or comments. <br />Summary of attachments: <br />Monitoring Well Data <br />Standard Deviation Charts for Each Well <br />CC: Chris Zadel, NCC <br />Stacy Churchill, NCC <br />