Laserfiche WebLink
1. NCCI will monitor and record data for MW #9 and MW #10 on a weekly basis for a three (3) year <br />period before establishing calculations for the minimum and maximum Standard Deviations for <br />these two wells. (July — 2011 to June -2014) <br />2. Since there is such a great variance in the water table from the irrigation season to the non <br />irrigation season NCCI proposes to establish over the three year period of time Standard <br />Deviations for the irrigation season — May thru September and Standard Deviations for the non - <br />Irrigation season — October thru April. <br />NCCI feels that this method will provide accurate monitoring well data for MW #9 and MW <br />#10. NCCI will continue monitoring of MW #1 thru MW #8 and continue all reporting and other <br />requirements as per Technical Revision No. 5 as approved. <br />NCCI appreciated your consideration of these matters to revise Technical Revision No. 5 as per <br />this request. <br />Plea cont. t me anv s or con.-ents. <br />Attachments: <br />Copy of Technical Revision No. 5 request — letter dated June 16, 2011 <br />Copy of letter approving Technical Revision No. 5 — dated June 22, 2011 <br />Copy of Monitoring Well Map with flood irrigation property clearly indicated <br />