Laserfiche WebLink
RECEIVED <br />EXHIBIT C -1 FEB 2 7 2012 <br />#M -77 -443 GRAND JUNCTION rILLO OFFICE <br />RECLAMATION MINING & SAFETY <br />(a) Starting date will be May 1, 2012. Ending date will be sometime in <br />2017. <br />(b) Plus or minus 12 inches of topsoil will be salvaged for reclamation <br />process. Some topsoil will be applied when salvaged the balance of the <br />topsoil will be stockpiled and used as needed. <br />(c) 1' to 4' of overburden will be stockpiled. <br />(d) 4' -18' of sand will be mined and processed for concrete sand. <br />(e) One 30' wide road will be used for access in and out of pit. Components <br />of the mining operation will be screening plant, conveyors, loader etc.. <br />(f) n/a <br />(g) Access road in and out of pit will be 30' wide plus or minus 500' long. <br />(h) n/a <br />(i) No water will be encountered other than snow melt off in the spring. <br />(j) n/a <br />(k) n/a <br />(1) n/a <br />(m) Deposit will be processed on site with a screening plant, conveyors, <br />loaders etc. No chemicals will be used in this process. <br />(n) Sand will be screened and processed for use in concrete and roads etc. <br />(o) n/a <br />(p) n/a <br />