Laserfiche WebLink
NSI Plant <br />275 <br />175 <br />80 IP <br />-- <br />NSI Plant Expansion (projected) <br />160 <br />100 <br />106 IP <br />-- <br />Storage Dome <br />100 <br />100 <br />50 <br />-- <br />Scale Building <br />100 <br />20 <br />15 <br />-- <br />Tank Farm (5) <br />-- <br />30 dia <br />50 <br />-- <br />Pipelines (current, max. projected) <br />8,300, 9,200 <br />10 dia <br />-- <br />-- <br />Conveyor System (current, max. projected) <br />200, 250 <br />-- <br />-- <br />-- <br />Electrical Power Line <br />2100 <br />-- <br />-- <br />-- <br />Pond area <br />-- <br />-- <br />-- <br />18.9 <br />Plant area <br />-- <br />-- <br />-- <br />8 <br />Well pads (current, max. projected - excludes <br />interim reclaimed monitor wells) <br />-- <br />-- <br />-- <br />14.2, <br />20.2 <br />Roads (current, max. projected) <br />-- <br />-- <br />-- <br />2, <br />3 <br />Area west of pond <br />-- <br />-- <br />-- <br />4.5 <br />Ponds <br />-- <br />-- <br />-- <br />18.9 <br />Plant area (rip as necessary) <br />-- <br />-- <br />-- <br />8 <br />Well pads (current, max. projected - excludes <br />interim reclaimed monitor wells) <br />-- <br />-- <br />-- <br />14.2, <br />20.2 <br />Rip Roads (current, max. projected) <br />-- <br />-- <br />-- <br />2, <br />3 <br />Pond area <br />-- <br />-- <br />-- <br />18.9 <br />Plant area <br />-- <br />-- <br />-- <br />8 <br />Well pads (current, max. projecte -d - excludes <br />interim reclaimed monitor wells) <br />-- <br />-- <br />-- <br />14.2, <br />20.2 <br />Roads (current, max. projected) <br />-- <br />-- <br />-- <br />2, <br />3 <br />Demolition <br />Regrade <br />Topsoil Distribution <br />Revegetation <br />IP: in part <br />Daub & Associates, Inc. <br />Production - Reclamation Projections Through 2024 <br />Projected Reclamation Items - 2012 -2024 <br />Length (ft.) Width (ft.) Height (ft.) Area (ac) <br />Page 4 of 4 Natural Soda, Inc. Amendment No. 03 Exhibit L <br />