Laserfiche WebLink
SECTION 3 -C <br />SCALE 1" = 20' H &V <br />NOTES, SECTION 3 -C <br />1. SLOPE SURFACE OF DIVERSION CHANNEL <br />BACKFILL TO 2H:1 V OR FLATTER. <br />2. SPREAD TOPSOIL ON THE SURFACE OF SLOPE <br />AND REVEGETATE. <br />3. PLACE THE FILL IN APPROXIMATELY HORIZONTAL <br />LAYERS NO MORE THAN 24 INCHES IN THICKNESS <br />BY ROUTING THE CONSTRUCTION EQUIPMENT <br />UNIFORMLY OVER THE FILL SURFACE. <br />4. COMPACTED FILL SHALL HAVE A DRY DENSITY <br />OF AT LEAST 90% OF THE MAXIMUM DRY DENSITY. <br />5. STABILITY ANALYSIS ARE PRESENTED IN DETAIL IN GEO -HYDRO <br />REPORT, VOLUME 6, OF THE PERMIT. <br />REVISED BY: T.K.B. 03/07/12 <br />REVISED: 04/16/96 07/10/01 <br />f��ii 3P7�'1 <br />MAR 14 2012 <br />Division of Reclamatron <br />Mining and Safety <br />