Laserfiche WebLink
1. <br />rL[HC <br />ORIGINAL <br />SECTION 3 -A <br />SCALE 1" = 20' H &V <br />OPERATIONAL SI <br />RECLAIMED SURFACE (PERMITTED) <br />-1 <br />REVISED BV. TKB 03107/12 <br />CHECKED BY: 04/16/98 07/10/01 <br />SECTION 3 -13 <br />SCALE V = 20' H &V <br />NOTES, SECTION 3 -A <br />1. SLOPE SURFACE OF DIVERSION CHANNEL <br />BACKFILL TO THE APPROXIMATE ORIGINAL SLOPE. <br />2. SPREAD TOPSOIL ON THE SURFACE OF SLOPE <br />E (RECLAIMED) AND REVEGETATE. <br />3. PLACE THE FILL IN APPROXIMATELY HORIZONTAL <br />LAYERS NO MORE THAN 24 INCHES IN THICKNESS <br />BY ROUTING THE CONSTRUCTION EQUIPMENT <br />UNIFORMLY OVER THE FILL SURFACE. <br />4. COMPACTED FILL SHALL HAVE A DRY DENSITY <br />OF AT LEAST 90% OF THE MAXIMUM DRY DENSITY. <br />RECEIVED <br />MAR 1 � 2012 <br />NOTES, SECTION 3 -B <br />Division Mngand amation, <br />Mining and Safety <br />AS -BUILT SURFACE (RECLAIMED) <br />DIVERSION CHANNEL <br />1. SLOPE SURFACE OF DIVERSION CHANNEL <br />BACKFILL TO 3HA V OR FLATTER. <br />2. SPREAD TOPSOIL ON THE SURFACE OF SLOPE <br />AND REVEGETATE. <br />3. PLACE THE FILL IN APPROXIMATELY HORIZONTAL <br />LAYERS NO MORE THAN 24 INCHES IN THICKNESS <br />BY ROUTING THE CONSTRUCTION EQUIPMENT <br />UNIFORMLY OVER THE FILL SURFACE. <br />4. COMPACTED FILL SHALL HAVE A DRY DENSITY <br />OF AT LEAST 90% OF THE MAXIMUM DRY DENSITY. <br />