Laserfiche WebLink
Bond Release <br />- 3 - March 12, 2012 <br />1 East Mine was performed. (The 2008 reclamation is a continuation of the 2001 <br />activities in which surface structures were removed). The 2008 reclamation <br />consisted of returning portions of the disturbed area back to approximate original <br />contours and hydro seeding with a permanent seed mix and wood fiber mulch. <br />During 2009 final grading of the Bowie #1 East Mine was completed (excluding <br />required sediment control structures). The 2009 activities which were a continuation <br />of the 2008 activities, included the final grading and hydro seeding with an approved <br />permanent seed mix, and mulched with a wood fiber mulch. <br />All reclamation work has been performed in accordance with plans approved by the <br />Division of Reclamation Mining and Safety. <br />17. Copies of the written notice to seek release to parties identified in Rule 3.03.2(1): <br />A Certificate of Service which documents the notices required under Rule 3.03.2(1) <br />have been mailed is enclosed. <br />18. Copy of newspaper advertisement: Proof of publication of the public notice of the <br />partial bond release should be available in about four to five weeks. <br />Please call if you have any questions. <br />Sincerely, <br />(‘' / <br />J. E. Stover, P.E. <br />Consulting Engineer <br />Enclosures <br />1. Figures 1, 2, 6A -5E, 6A -5F, 6A -5L, 6A -5M, 6A -5I, 6A -5H, 6A -50, 6A -5G, 6A -5J, <br />6A -5K, 6A -5P <br />2. Partial Bond Release Letter <br />3. Public Notice <br />4. Certificate of Service for Partial Bond Release Letter <br />