Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />118 <br />119 <br />120 <br />121 <br />Remove Culverts & powerline extension <br />DEMOLISH <br />1 <br />6.00 <br />$3,202.20 <br />$310.00 <br />$53.00 <br />$1,172.45 <br />Rip aditional 1220 ft zig zag rd & 1275 ft. slurry <br />line road <br />RIPPER <br />1.45 <br />Replace topsoil on zig -zag road <br />EXCAVATE <br />0.48 <br />Seed additional .8 ac disturbances with Rangland <br />seed mix <br />REVEGE <br />1.50 <br />SUBTOTALS: <br />9.43 <br />$ $4,737.65 <br />Task description: <br />Site: New Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />000 <br />3/13/2012 <br />JHB <br />Agency or organization name: <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />COST SUMMARY WORK <br />Cell repeater , 3 light use roads <br />Permit Action: TR62 <br />State: Colorado <br />County: Las Animas <br />DRMS <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />2.02 Total = <br />1.05 Total = <br />4.71 Total = <br />10.00 Total = <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />0.00 <br />4.25 <br />5.00 <br />CONTINGENCY: 0.00 <br />Permit/Job #: C1981012 <br />Abbreviation: None <br />Filename: C012 -000 <br />Total = <br />Total = <br />$95.70 <br />$49.75 <br />$279.30 <br />$473.77 <br />$898.52 <br />$5,636.17 <br />0.00 <br />$239.54 <br />$281.81 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $1,419.87 <br />TOTAL BOND AMOUNT (direct + indirect) = $6,157.52 <br />