Laserfiche WebLink
February 9, 2012 C- 1996 -083 /13owie No. 2 Mine BFB <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br />All roads and parking areas around the main facility area were plowed, passable and draining properly. <br />The B -seam and D -seam bench areas were muddy but were passable and appeared to be stable (photo 2). <br />SIGNS AND MARKERS — Rule 4.02: <br />Mine ID signs were in place at the main entrance and train loadout entrance. <br />DOCUMENTS RECEIVED: none <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />No enforcement actions were taken as a result of this inspection. <br />PHOTOGRAPHS <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 4 <br />Photo 1 — Distributing Topsoil on Gob Pile 2 <br />