My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-12_REPORT - C1982056 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1982056
>
2012-03-12_REPORT - C1982056 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:55:04 PM
Creation date
3/12/2012 10:47:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
3/12/2012
Doc Name
2011 Annual Hydrology Report (1 of 2)
From
Twentymile Coal Company
To
DRMS
Annual Report Year
2011
Permit Index Doc Type
Hydrology Report
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fish Creek Tipple site is located approximately 15 miles southwest of Steamboat Springs at the northeast end of <br />Twentymile Park, covering an area of approximately 15 acres. <br />Foidel Creek flows eastward, and is located adjacent to the TC Foidel Creek Mine surface facilities. Foidel Creek <br />receives treated effluent from a series of sediment ponds established at the facility. Mine site drainage is <br />controlled through seven (7) sediment ponds (Ponds T, B, C, D, E, F, and G — see Figure 2 in Map Pouch at back <br />of report). Mine water is discharged from the mine and routed through Pond D prior to being discharged to <br />Foidel Creek. <br />The Fish Creek drainage is located north of the Foidel Creek Mine surface facilities area and overlies tracts, <br />which have been longwall mined. Fish Creek runs through the Twentymile Park syncline area. Mine water was <br />historically discharged into Fish Creek via the Fish Creek Borehole (FCBH) pump and sodium hydroxide <br />treatment pond facility (discharge site 115), however that practice ceased in early 2005. In 2005, an electro- <br />coagulation treatment was constructed re -using the FCBH pump. Treated mine water was directed back <br />underground for dust suppression. Electro-coagulation treatment assists in minimizing pipe scaling underground. <br />Note that electro-coagulation treated water was not discharged from site 115 to Fish Creek in 2010, and only <br />discharged for a couple of days in January 2011 due to a pipeline valve crack. No other discharge occurred in <br />2011. <br />Spoil springs (sites 303 -1, 303 -2, and 303 -3) from the former surface operations at the Fish Creek Tipple site <br />(east of the TC Foidel Creek Mine and Twentymile Park area) also discharge to Fish Creek at surface site 62. <br />The southwest area of TC (Eckman Park area), has been reclaimed and has been released from bond. In addition, <br />the former surface mine area referred to as Area 1 was released from bond in January 2002. As a result, the <br />Colorado Department of Public Health and Environment (CDPHE) subsequently approved eliminating Ponds A <br />(Eckman Park) and H (Area 1) from our ongoing NPDES monitoring program in 2002. <br />Surface coal mining has been conducted in the area since the 1960's. The Fish Creek Tipple site was constructed <br />in 1974, and ceased operation in 1983. The Foidel Creek Mine underground operation was later established in <br />1983, and has been an on -going operation using a longwall mining process since 1989. This is a form of <br />underground mining where a 1000 foot long wall is mined in a single slice (typically 1 -2 m thick). The block of <br />coal being mined, known as the longwall "panel ", may be on the order of 12,000 feet long. The gate road along <br />one side of the wall is called the main gate, while the other side is called the tail gate. The end of the block that <br />includes the longwall equipment is called the "face ". Air is provided by ventilation fans and associated bleeder <br />vent shafts from the surface. The advantage of longwall mining is that over 80 percent of the coal is recovered, <br />compared with about 50 percent for the traditional pillar method. In addition, subsidence is immediate, allowing <br />for better planning by the mining company. The Foidel Creek Mine portals are faced -up in the down dip high - <br />wall of the strip mine. <br />Hydrologic monitoring was initiated by CYCC in 1979. TC continues the monitoring program under updated <br />DRMS permit requirements, which is discussed in the next section. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.