Laserfiche WebLink
East Taylor Pond <br />2088 C.Y. <br />August 2011 <br />Rail Loop Pond <br />160 C.Y. <br />October 2011 <br />Gossard Pond <br />3240 C.Y. <br />August /September 2011 <br />Work Area Pond <br />1600 C.Y. <br />October 2011 <br />Colowyo Coal Company <br />2011 Annual Reclamation and Hydrology Report <br />GENERAL DISCUSSION <br />CDPS Impoundments — During calendar year 2011, the twelve CDPS impoundments <br />were inspected on a quarterly basis. Please refer to Exhibit 1A for location of the <br />twelve impoundments. Routine maintenance was performed when necessary during <br />the year. None of the impoundments displayed any structural weakness or otherwise <br />hazardous conditions. Six other non -CDPS impoundments were inspected on a <br />quarterly basis as per guidelines. None of these impoundments displayed any <br />structural weakness or otherwise hazardous conditions. <br />Table 1 Summary of material removed from CPDS impoundments in 2011. <br />POND CLEANED OUT <br />AMOUNT OF <br />MATERIAL REMOVED TIME OF REMOVAL <br />Small Impoundments /Livestock Water Tanks — During 2011, the thirteen Livestock <br />Water Tanks were inspected during the third quarter. Livestock Water Tanks are <br />being inspected on an annual basis. The impoundments did not display any signs of <br />structural weakness or otherwise hazardous conditions. <br />