Laserfiche WebLink
Colowyo Coal Company <br />2011 Annual Reclamation and Hydrology Report <br />Figure 7 -4 — South Taylor Fill Quarterly Inspection Report Continued <br />INSPECTION REKNIT „ SOUTH TAYLOR FILL <br />(Including Both the East Taylor and West Taylor Fill Segments) <br />INDICATE QUARTER -3 1s1 <br />2ND 3RD ® 4TH <br />*ALL QUARTERS NEED TO DE CERTIFIED* <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No No final fill face established Yes <br />If yes, explain: <br />Date of Inspection: 9/19/2011 <br />Inspected By: T. Peterson <br />e e ��e �PDO L .C <br />. ° o� • y `r^ 4 <br />=�f' 3257 e" - <br />0 <br />. ' 1/7_o/(7.1,a e <br />Signed: � r�> l ' .•,.. • e <br />Date:__._ — — — , i � � 1 11 11 ►���� s`e ee <br />Page 7 -20 <br />THOMAS C PETERSON <br />A.E. No. 32257 <br />2011 <br />YEAR <br />TI IE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br />1) t any significant change been noted In the survey monuments on the fill? <br />No N/A Yes <br />If yes, explain: <br />of Survey:_ <br />Reviewed By: Torn Peterson <br />2) Has any significant change been noted in the water level found in the fill monitoring <br />well? <br />No N/A Yes Measured Level <br />If yes, explain: <br />Date of Measurement: N/A <br />Measured By: T. Peterson <br />3) Has there been any evidence of surficial slope failure on the face of the fill? <br />No No final fill face established Yes <br />If yes, explain: <br />Date of P.E. Inspection: 9/19/2011 <br />Inspected By: T. Peterson <br />Reference Permit - Volume 13, Exhibit 21, Item 1, Inhoductory Pages <br />CF: HSEC124.20.04 Revised Feb. 7, 2008 <br />