Laserfiche WebLink
Colowyo Coal Company <br />2011 Annual Reclamation and Hydrology Report <br />Figure 7 - West Pit Fill Quarterly Inspection Reports Continued <br />INSPECTION REORT -• WEST PIT FILL <br />INDICATE QUARTER -, 1 ST D 2ND D 3R0 D 4 ® 2011 <br />YEAR <br />* ALL QUARTERS NEED MBE CERTIFIED* <br />THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br />1) Has any significant change been noted in the survey monuments on the fill? <br />No X Yes <br />If yes, explain: <br />Date of Survey: 10/19/2011 <br />Reviewed By: Jerry Maass & Tom Peterson <br />2) Has any significant change been noted in the water level found in the 8t monitoring <br />wet? <br />No X Yes Measured Level 74.20 ft <br />If yes, explain: <br />Date of Measurement: 10118/2011 <br />Measured By: T. Peterson <br />3) Has there been any evidence of surficial slope failure on the face of the fit? <br />No X Yes <br />If yes, explain: <br />Date of P.E. Inspection: 10/1612011 <br />Inspected By: T. Peterson <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No _X_ Yes <br />If yes, explain: <br />Date of Inspection: 10/1812011 <br />Inspected By: T. Peterson <br />�Oot11Eft <br />o�� ••s P Ei ' <br />v <br />Signed: F 32267 I_ <br />Date: / /L9 //f .•.c, <br />b.. /ONA4 J <br />Reference Permit - Volume 5-B, Exhibit 19, Page I a -4 <br />CF: HSEQ 24.20 Revised March 7, 2008 <br />