Laserfiche WebLink
Colowyo Coal Company <br />2011 Annual Reclamation and Hydrology Report <br />Figure 7 -1— West Pit Fill Quarterly Inspection Reports <br />INSPECTION REPORT - WEST PIT FILL <br />INDICATE QUARTER —> 1 <br />* ALL QUARTERS NEED TO AE CERTIFIED * <br />THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br />1) Has any significant change been noted in the survey monuments on the fill? <br />No N/A Yes <br />If yes, explain: <br />Date of Survey: N/A <br />Reviewed By: Jerry Magas & Tom Peterson <br />2) Has any significant change been noted in the water level found in the fill monitoring <br />wef? <br />No N/A Yes Measured Level N/A <br />If yes, explain: <br />Date of Measurement. Not Accessible <br />Measured By: T. Peterson <br />3) Has there been any evidence of surficial slope failure on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of P.E. Inspection: 3/31/2010 <br />Inspected By: T. Peterson <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of Inspection: 3/31/2010 <br />Inspected By: T. Peterson <br />�pW�lmll /b iii, <br />.�Q c F'Y 4 � <br />f U j <br />Signed: / ir C (4 _ 32257 1 'e s <br />Date: 4/7 .%s / rind E- <br />th "iftn11111t <br />T P.E. No. 3 ON <br />2 0 3 0 4 111 D 2011 <br />YEAR <br />Reference Permit - Volume 5 - 8, Exhibit 19, Page I a - 4 <br />CF: HSEQ 24.20 Revised March 7, 2006 <br />Page 7 -3 <br />