My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-09_REPORT - C1981019 (10)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981019
>
2012-03-09_REPORT - C1981019 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:55:01 PM
Creation date
3/12/2012 8:45:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
3/9/2012
Doc Name
2011 Annual Hydrology & Reclamation Report (1 of 4)
From
Colowyo Coal Company
To
DRMS
Annual Report Year
2011
Permit Index Doc Type
Hydrology Report
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo Coal Company <br />2011 Annual Reclamation and Hydrology Report <br />SECTION 6 - 2011 ANNUAL REPORT CROSS SECTIONS <br />RULE REQUIREMENT <br />RULE 2.04.13(1)(a -f) <br />2.04.13(1) by April 1, or other such date as agreed on, each permittee shall file an <br />annual reclamation report covering the previous calendar year for all areas under <br />bond. The report shall include, but not limited to, text, discussion and maps which <br />address: <br />• the name and address of the permittee and permit number <br />• location and number of acres disturbed during that year <br />• location and number of acres backfilled and graded during that year <br />• location and number of topsoiled during that year <br />• the species, location and number of acres of vegetation planted during that <br />year, including any augmented seeding or cultural practices <br />• location, number of acres and date of planting for all previously revegetated <br />areas <br />Rule 2.04.13(2) the Permittee may provide additional monitoring information as <br />required by the approved permit <br />GENERAL DISCUSSION <br />Cross sections 1 -5 illustrate the elevation difference of the post — mining, original and <br />existing topography. In addition we have the predicted post — mining topography and <br />Bottoms of "F" and "G" Seams. Along the cross — section we have noted the following <br />delineations for each cross section: <br />• Disturbance Limit <br />• Mining Limit <br />• Phase II Bond Release <br />• 2001 Regraded <br />• 2002 Regraded <br />• 2003 Regraded <br />• 2005 Regraded <br />• 2007 Regraded <br />• 2011 Regraded <br />Page 6 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.