Laserfiche WebLink
Colowyo Coal Company <br />2011 Annual Reclamation and Hydrology Report <br />GENERAL DISCUSSION 1 <br />SECTION 10 — SHRUB ESTABLISHMENT STUDY; TECHNICAL PROGRESS REPORT 1 <br />RULE REQUIREMENT 1 <br />GENERAL DISCUSSION 1 <br />FIGURE 10 -1 - SHRUB ESTABLISHMENT STUDY: TECHNICAL PROGRESS REPORT 2 <br />SECTION 11 — TOPSOIL VOLUME INVENTORY 1 <br />RULE REQUIREMENT 1 <br />GENERAL DISCUSSION 1 <br />FIGURE 11 -1 - RECLAMATION AREAS AND TOPSOIL DEPTHS 2 <br />FIGURE 11 -2 - TOPSOIL STOCKPILE VOLUME BY YEAR 4 <br />FIGURE 11 -3 — TOPSOIL MOVEMENTS DURING REPORT PERIOD 5 <br />FIGURE 11 -4 - TOPSOIL SCHEDULE FOR MINING AREA 6 <br />FIGURE 11 -5 — VARIABLE DEPTH TOPSOIL VERIFICATION 7 <br />SECTION 12 — DRILL HOLE LOCATIONS 1 <br />RULE REQUIREMENT 1 <br />GENERAL DISCUSSION 1 <br />SECTION 13 — BOND RELEASE 1 <br />RULE REQUIREMENT 1 <br />GENERAL DISCUSSION 1 <br />SECTION 14 —DITCH CONSTRUCTION CERTIFICATIONS 1 <br />RULE REQUIREMENT 1 <br />GENERAL DISCUSSION 1 <br />FIGURE 14 -1 — FINAL EAST PIT DITCH AREA AS- BUILT/DESIGN DITCH 8 <br />FIGURE 14 -2 — WEST PIT AREA AS- BUILT /DESIGN DITCHES 9 <br />FIGURE 14 -3 — TRIB D AND F DITCHES AS- BUILT/DESIGN DITCHES 10 <br />FIGURE 14 -4 — FINAL EAST PIT DITCH AS- BUILT/DESIGN PROFILE 11 <br />FIGURE 14 -5 — EAST TAYLOR DITCH AS- BUILT/DESIGN PROFILE 12 <br />FIGURE 14 -6 — TRIB D AND TRIB F AS- BUILT/DESIGN PROFILE 13 <br />Page ii <br />