Laserfiche WebLink
The ground water levels and water quality conditions in the Bateman Creek drainage will <br />continue to be monitored by WCMW -2, WCMW -3, and WCMW -6. <br />Vindicator Valley <br />4.2.1 Current Conditions <br />The Vindicator Valley drainage and MLE permit boundary are shown on Figure 2 -1. <br />Vindicator Valley is a south oriented dry drainage. Vindicator Valley has a confluence <br />with the North Fork of Wilson Creek where Teller County Road 81 passes through the <br />area. The North Fork of Wilson Creek is a south - southwest flowing drainage (through <br />the unincorporated Town of Goldfield). <br />MLE disturbance in Vindicator valley consists of the east wall of the Main Cresson Mine <br />area and the south wall of the East Cresson Mine Extension. Development of these <br />surface mines will continue through 2016 under Amendment No. 8, MLE, and the East <br />Cresson Mine Extension approvals. The limits of these mine components are shown on <br />Figure 2 -1. The existing EMPs that collect and dissipate storm water runoff are shown <br />on Figure 2 -1. <br />Vindicator Valley is within the Diatreme as is shown on Figure 2 -2. <br />4.2.2 Mine Life Extension 2 <br />MLE2 does not propose to construct any new or expand any existing facilities in the <br />Vindicator Valley drainage. The EMPs will continue in MLE2. The disturbance limits <br />and the proposed facilities for MLE2 across the Cresson Project are shown on Figure 2 -2. <br />MLE2 will not impact any of the existing ground water monitor stations in the Vindicator <br />Valley drainage. <br />4.2.3 Surface Water <br />4.2.3.1 Monitoring Program <br />There are no surface water resources in Vindicator Valley. Three surface water monitor <br />stations are sited in the North Fork of Wilson Creek (Theresa Gulch). These sample <br />stations are discussed in the Wilson Creek section. The Wilson Creek sample stations are <br />shown on Figure 2 -2. <br />4.2.3.2 Data <br />There are no surface water data for Vindicator Valley. <br />'Cripple Creek & Victor Gold Mining Company <br />Cresson Project Hydrologic Evaluation for Mine Life Extension 2 <br />11 <br />