Laserfiche WebLink
Mining Phase <br />Higher Grade Ore <br />(MMt) <br />Ore <br />(MMt) <br />Overburden <br />(MMt) <br />Total <br />(MMt) <br />Through Amendment No. 8 <br />0 <br />180 <br />360 <br />540 <br />Amendment No. 9 (MLE1) <br />0 <br />230 <br />305 <br />535 <br />This Amendment (MLE2) <br />11 <br />209 <br />310 <br />530 <br />Totals through MLE2 <br />11 <br />619 <br />975 <br />1,605 <br />Cresson Pro'ect H dro • eochemist <br />AdrianBrown <br />Table 1— Cresson Project Production <br />Notes: <br />1. Tonnages for production through Amendment No.8 taken from Amendment No. 9 Permit Application, CC &V, 2008, p.1 -4 <br />2. Tonnages for Amendment 9 (MLE) assume that the total permitted production was extracted. <br />3. Because of changing gold price, volumes projected in Amendment Nos. 8 and 9 may have changed accordingly. <br />1385L.20120125 25 <br />