The timelines presented herein for active mining, ore placement, continued recovery, <br />neutralization, reclamation, and other activities are approximate and are based on anticipated <br />production rates, mining fleet, crusher availability, gold price, gold recovery, and many other <br />factors. For example, the currently permitted mine production rate of approximately 27 MT is <br />noted but that production rate could decrease or increase for various reasons. As such, these <br />approximate timelines may change and result in a shorter overall mine life or a longer overall <br />mine life of the Cresson Project. <br />The following are the key project elements under the proposed MLE2: <br />• A new SGVLF and appropriate modifications of the drainage and storm water <br />management plan in Squaw Gulch to accommodate the SGVLF <br />• A new SGADR and associated power supply with final gold refining continuing to occur <br />at the existing Arequa Gulch ADR facilities ( "AGADR ") <br />• New High Grade Mill facilities for gold recovery including grinding, flotation, and <br />Carbon -In -Pulp ( "CIP ") circuits with final gold recovery continuing to occur at the <br />existing AGADR facilities <br />• Extended mining areas associated with the Main Cresson Mine, the WHEX portion of the <br />East Cresson Mine, and the Schist Island and Globe Hill portions of the North Cresson <br />Mine <br />• Some changes in categories of affected acreage within the permit boundary (e.g. from <br />SGOSA to SGVLF) <br />• Extension of visual, noise, and lighting berm northwest and west of North Cresson Mine <br />• Addition of haul roads to connect the extended mine areas, LOB, the High Grade Mill <br />facilities, and VLFs <br />• New security access to SGADR -from a realigned portion of State Highway ( "SH ") 67 in <br />Squaw Gulch, referred to as Squaw Gulch Security Access <br />• An extension and redesign to the ECOSA <br />• Changes to the SGOSA to accommodate the SGVLF with elimination of the SGOSA <br />Extension <br />• Security, offices, and warehouse facilities for the SGVLF and SGADR <br />• Additional ore stockpiles <br />• A laydown yard and Projects Office facilities <br />Several other peripheral activities will occur for which no approval is sought or needed from the <br />Mined Land Reclamation Board ( "MLRB ") or OMLR. For example, the existing Grassy Valley <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension 2 <br />1 -5 <br />