Laserfiche WebLink
14.1.1 Evaluation of Project Components <br />MLE2 satisfies the DMO requirements by virtue of the proposed use of toxic chemicals <br />in gold recovery process. Such chemicals are presently in use at the Cresson Project <br />within the AGVLF and AGADR areas exclusively. The SGVLF and SGADR will use <br />the same chemicals and processes used in present operations. The High Grade Mill <br />facilities will use additional potentially toxic chemicals in the extractive metallurgical <br />processing. These include flotation reagents and sodium cyanide. <br />The chemicals in use and stored for use within the VLFs, ADRs, and High Grade Mill <br />facilities are listed on Table 14 -2, which includes information on the chemical use at the <br />site, typical storage volumes, and the ultimate fate of the chemical. <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension 2 <br />14 -3 <br />