Laserfiche WebLink
13.0 RECLAMATION COSTS <br />13.1 Introduction and Approach <br />The financial warranty calculations addressed below include the reclamation for the entire <br />Cresson Project, including the activities of MLE2. Updated and current reclamation costs for all <br />aspects of the Cresson Project have been provided, including any facility changes to support the <br />planned MLE2. <br />Included in the cost calculation are the following facilities and related cost items. <br />• Main Cresson Mine area <br />• East Cresson Mine area <br />• North Cresson Mine area <br />• SGOSA <br />• ECOSA <br />• VLF Rinsing and Neutralization for both AGVLF and SGVLF <br />• VLF Physical Reclamation for both AGVLF and SGVLF <br />• AGADR and SGADR <br />• High Grade Mill facilities <br />• Ajax Area and Pads 3 & 4 <br />• ESP, Sediment Ponds, and Storm Water Control Basins <br />• Monitoring Wells and Piezometers <br />• Haul Roads <br />• Growth Medium Stockpiles <br />• Powerlines <br />• Support Buildings and Footprints <br />• Surface Mine Highwall Fencing <br />• Clean-up and Miscellaneous Areas <br />• Revegetation Repairs and Maintenance <br />• Ancillary Areas <br />• Viewshed Conservation Areas <br />• Mobilization and De- mobilization of Equipment <br />• Post - Reclamation Monitoring of Water and Vegetation <br />• Indirect Costs per OMLR Rule 6 (Public Liability, Contractor's Performance Bond, <br />Overhead and Profit, OMLR Management Fee, and Contingency) <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension 2 <br />13 -1 <br />