Laserfiche WebLink
13.2 Project Financial Warranty Requirements 13 -3 <br />13.3 Reclamation Earthmoving Costs 13 -3 <br />13.4 Calculation of Production Rates for Equipment 13 -5 <br />13.5 Calculation of Revegetation Costs 13 -5 <br />13.6 Calculation of Demolition Costs 13 -5 <br />13.7 Calculation of Detoxification Costs 13 -6 <br />13.8 Summary 13 -6 <br />14.0 ENVIRONMENTAL PROTECTION PLAN/EMERGENCY RESPONSE PLAN <br />14 -1 <br />14.1 Introduction 14 -1 <br />14.1.1 Evaluation of Project Components 14 -3 <br />14.2 Maps 14 -6 <br />14.3 Environmental Protection Measures Required By Other Agencies 14 -6 <br />14.4 Other Permits and Licenses 14 -6 <br />14.5 Designated Chemical(s) Evaluation 14 -10 <br />14.6 Designated Chemical(s) and Material(s) Handling 14 -10 <br />14.7 Facilities Evaluation 14 -11 <br />14.8 Ground Water Information 14 -12 <br />14.9 Ground Water Quality Data 14 -13 <br />14.10 Surface Water Control and Containment Facilities Information 14 -13 <br />14.11 Surface Water Quality Data 14 -14 <br />14.12 Water Quality Monitoring Plan 14 -14 <br />14.13 Climate 14 -14 <br />14.14 Geochemical Data and Analysis 14 -14 <br />14.15 Construction Schedule Information 14 -15 <br />14.16 Quality Assurance and Quality Control 14 -15 <br />14.17 Plant Growth Medium 14 -15 <br />14.18 Wildlife Protection 14 -16 <br />14.19 Disposal of Tailings and Sludges in Mine Workings 14 -16 <br />14.20 Emergency Response Plan 14 -16 <br />15.0 REFERENCES 15 -1 <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension 2 <br />v <br />