Rule Number
<br />Brief Description of Rule Requirement
<br />Location in Application
<br />6.4.3(e)
<br />Vegetation
<br />Sec. 4.6, Project
<br />Description, Volume I,
<br />Appendix 3 Volume III
<br />6.4.3(0
<br />Water Information
<br />Sec. 4.6, Project
<br />Description, Volume I,
<br />Appendix 2, Volume II
<br />6.4.3(g)
<br />Man -made structures
<br />Drawing C -1 and C -la,
<br />Exhibit C, Volume I
<br />6.4.3(h)
<br />Soils Information
<br />Sec. 4,8, Project
<br />Description, Volume I,
<br />Appendix 3, Volume III
<br />6.4.4(a)
<br />Description of mining methods
<br />Sec. 5 of Project
<br />Description, Volume I
<br />6.4.4(b)
<br />Earthmoving
<br />Sec. 5 and 7, Project
<br />Description, Volume I
<br />6.4.4(c)
<br />Water diversions and impoundments
<br />Sec. 5, 7, and 10, project
<br />Description, Volume I
<br />6.4.4(d)
<br />Size of areas to be worked
<br />Sec. 1.0 and 5.0, Project
<br />Description, Volume I,
<br />Drawing C -5, Exhibit C
<br />6.4.4(e)
<br />Timetable
<br />Sec. 5.4, Project
<br />Description, Volume I
<br />6.4.4(0
<br />Deposit and stratum
<br />Sec 4.4, Project
<br />Description, Volume I
<br />6.4.4(g)
<br />Commodities and intended use
<br />Application Form
<br />6.4.4(h)
<br />Incidental products
<br />Sec. 4.3, Project
<br />Description, Volume I
<br />6.4.4(i)
<br />Explosives
<br />Sec. 5.4.4, Project
<br />Description, Volume I
<br />6.4.5(1)
<br />Reclamation plan specificity and flexibility
<br />Sec. 12, Project
<br />Description, Volume I
<br />6.4.5(2)(a)
<br />Type of reclamation, acreage and earthmoving
<br />Sec. 12, Project
<br />Description, Volume I
<br />6.4.5(2)(b)
<br />Comparison of post mining land use
<br />Sec. 4.3 and 12, Project
<br />Description, Volume I
<br />(see Sec. 3.1)
<br />6.4.5(2)(c)
<br />Compliance with Sec. 3.1
<br />6.4.5(2)(d)
<br />Plans for topsoil, species list and rates
<br />Sec. 12.3.3, Project
<br />Description, Volume I
<br />6.4.5(2)(e)
<br />Schedule
<br />Sec. 5.4, Project
<br />Description, Volume I
<br />6.4.5(2)(0
<br />Grading, seeding, fertilizing, revegetation,
<br />topsoil
<br />Sec. 12, Project
<br />Description, Volume I
<br />Cripple Creek & Victor Gold Mining Company
<br />Cresson Project Mine Life Extension 2
<br />5
<br />
|