Laserfiche WebLink
Rule Number <br />Brief Description of Rule Requirement <br />Location in Application <br />3.1.6(2) <br />Compliance for earth dams <br />Sec. 10, Project <br />Description, Volume I, <br />Appendix 12, Volume VI <br />3.1.6(3) <br />Erosion control <br />Sec. 12.3.4, Project <br />Description, Volume I <br />3.1.7(1) <br />Compliance with groundwater quality standards <br />Sec. 11, Project <br />Description, Volume I <br />3.1.7(2) <br />Point of compliance and protection levels <br />Sec. 11, Project <br />Description, Volume I <br />3.1.7(3) <br />Proposed Permit conditions <br />Sec. 11, Project <br />Description, Volume I <br />3.1.7(5) <br />Protection of groundwater quality (including <br />monitoring) <br />Sec. 11, Project <br />Description, Volume I <br />3.1.7(6) <br />Point of Compliance <br />Sec. 11, Project <br />Description, Volume I <br />3.1.7(7) <br />Groundwater Monitoring <br />Sec. 11, Project <br />Description, Volume I <br />3.1.7(8) <br />Release of Reclamation Liability <br />Sec. 12, Project <br />Description, Volume I <br />3.1.7(9) <br />Reporting of groundwater discharges <br />Sec. 10, Project <br />Description, Volume I <br />3.1.8(1) <br />Wildlife protection <br />Sec. 12, 14, Project <br />Description, Volume I, <br />Appendix 16, Volume VII <br />3.1.8(2) <br />Habitat management <br />Sec. 12 Project <br />Description, Volume I, <br />Appendix 16, Volume VII <br />3.1.9(1) <br />Topsoil segregation <br />Sec. 5.4.2, Project <br />Description, Volume I <br />3.1.9(2) <br />Woody vegetation <br />Sec. 5.4.2, Project <br />Description, Volume I <br />3.1.9(3) <br />Topsoil stockpiles <br />Sec. 5.4.2, Project <br />Description, Volume I <br />3.1.9(4) <br />Stockpile management <br />Sec. 5.4.2, Project <br />Description, Volume I <br />3.1.9(5) <br />Stabilization of topsoil <br />Sec. 5.4.2, Project <br />Description, Volume I <br />3.1.9(6) <br />Other materials <br />Sec. 5.4.2, Project <br />Description, Volume I <br />3.1.9(7) <br />Replacement of growing media <br />Sec. 12.2, Project <br />Description, Volume I <br />3.1.9(8) <br />Vegetative piles <br />Sec. 5.4.2, Project <br />Description, Volume I <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension 2 <br />3 <br />