My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-07_PERMIT FILE - C2010088 (29)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010088
>
2012-03-07_PERMIT FILE - C2010088 (29)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:54:50 PM
Creation date
3/8/2012 3:08:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Permit File
Doc Date
3/7/2012
Doc Name
Quality Assurance Program for Sediment Pond Liners - Ponds 1-3
Section_Exhibit Name
Exhibit 20
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAM Colorado Loadout <br />#00489 -0002 <br />01/06/12 <br />Huddleston -Berry <br />Degree of Saturation <br />1 per 5,000 yd <br />1 <br />Hydraulic Conductivity <br />ASTM D5084 <br />1 per 20,000 yd <br />1 <br />Specific Gravity' <br />ASTM D854 <br />*See note 1 <br />*See note 1 <br />Line of Optimums2 <br />ASTM D698, <br />ASTM D1557 <br />*See note 2 <br />*See note 2 <br />Specific Gravity will be determined during evaluation of borrow materials. <br />2 Line of Optimums will be determined during evaluation of borrow materials. <br />4) Reporting <br />a) Field compaction /moisture testing results will be reported to <br />contractor in the field. <br />b) Where testing indicates failing results, contractor will be directed <br />to re -work and re- compact materials until passing testing results <br />are obtained. <br />c) Final testing reports will be provided to contractor and client on <br />the Friday of the week after the testing is completed. <br />F. Project Close -Out <br />1) Upon completion of the liner construction, the Project Engineer will provide <br />a comprehensive CQA report to the client. The report will include: <br />a) Discussion of construction materials and methods. <br />b) Summary of materials testing. <br />c) Laboratory testing reports. <br />d) Field testing reports. <br />e) Plot of testing locations. <br />f) Statement by Project Engineer discussing conformance of liner <br />construction with design. <br />Exhibit 20 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.