Laserfiche WebLink
Huddleston -Berry <br />Fngineering & Testing, II.0 <br />Exhibit 20 <br />640 White Avenue, Unit B <br />Grand Junction, Colorado 81501 <br />Phone: 970 - 255 -8005 <br />Fax: 970 - 255 -6818 <br />HuddlestonBerry@Bresnan.net <br />Construction Quality Assurance Plan <br />Detention Ponds <br />CAM Colorado Loadout <br />Fruita, Colorado <br />Quality Assurance Plan Purpose — Ensure compliance of materials, workmanship, <br />construction, and functional performance of compacted clay liner with the design of the <br />detention ponds. <br />A. Quality Assurance Organization <br />1) Project Engineer —Michael A. Berry, P.E. <br />2) Field Testing Services Manager — Jason D. Collard <br />3) Field Testing Submittals — Jesse Lueras <br />B. Proposed Construction <br />1) The proposed construction includes three detention ponds lined with a 12- <br />inch thickness low permeability soils liner. The soils liner is proposed to <br />be constructed using native clay soils or native soils amended with <br />bentonite. The approximate sizes of the ponds are summarized in the <br />following table. <br />Pond # <br />Storage Volume <br />�ft3) <br />Pond Area <br />�ft2) <br />1 <br />82,746 <br />17,208 <br />2 <br />82,848 <br />10,607 <br />3 <br />18,291 <br />5,414 <br />C. Referenced Documents <br />1) Solid Waste Guidance Document Concerning Solid Waste Site and <br />Facility Engineering Design Quality Assurance /Quality Control Plans for <br />Disposal Cell Subgrade, Liner, Leachate Collection System (including <br />