Laserfiche WebLink
ATTACHED CLOMR EXHIBITS <br />TABLES <br />RW -1 Reed Wash Base Flood Elevations for Historic and Developed Conditions <br />FIGURES <br />RW -6 Reed Wash - 100 Year Water Surface Profile for Developed Conditions. <br />RW-6.1 Reed Wash Upstream Face Bridge Cross Section Station 3342.70 <br />RW -7 Reed Wash - 100 Year Profile Output Table for Developed Conditions. <br />RW -8 Reed Wash - Errors, Warnings and Notes Table for Developed <br />Conditions. <br />APPENDICES <br />RW -C Reed Wash 100 Year Floodplain Drawing — DEVELOPED CONDITIONS, <br />Sheet 2 of 3 <br />RW -E Bridge Input Documentation. <br />RW -E.1 Summary of Bridge Input Data <br />RW -E.2 HECRAS Internal Bridge Cross Sections - Upstream and Downstream <br />Face <br />RW -E.3 Bridge Design Drawing — Plan & Profile — Upstream <br />RW -E.4 Bridge Design Drawing — Plan & Profile — Downstream <br />