Laserfiche WebLink
EXHIBIT 17 <br />a -d--ek k <br />^� ; o -d -ek ca Guy as <br />k o -d -ak <br />a -d -ek <br />•�, <br />--}-- ---- fi-- t--- -�---- Posttian of Guy <br />PLAN <br />iF <br />t <br />t a -d -ek k <br />ca <br />1 -1 #Igor, I--- <br />F-- — — <br />�i <br />i t eu 3,,,08 <br />F Minimum <br />Guy ca <br />eu <br />X <br />,� y <br />3,_0" c d _ ek k <br />Minimum 0° SECTION X —X <br />' f 1 <br />1 f ' <br />1 F eu k <br />- -�--�- i- - --+-- Position of Guy <br />o <br />i F i o -d -ek cc <br />Neutral <br />ca <br />Neutral SECTION Y —Y <br />Item ca and cc are shown an assembly drawings M42 -3. M42 -11, M42 -13, <br />and M42 -21. <br />ITEM <br />N0. <br />MATERMS ITEM <br />N0. <br />UATERiAIS <br />a <br />1 <br />86it, machine, 5/8" x required length <br />as <br />3 <br />Deodend assembly, primary <br />d <br />5 <br />Washer, square, 3", curved <br />ca <br />1 <br />Deodend assembly, neutral <br />k <br />3 <br />insulator, suspension, epoxilator <br />ek <br />- <br />Locknut, as required <br />0 <br />d <br />Bolt, eye, 5/8" x required length <br />eu <br />2 <br />Insulator, fiberglass, strain <br />12.5 / 7.2 KV PRIMARY, 3 —PHASE <br />VERTICAL CONSTRUCTION — DEADEND (SINGLE) <br />DATE <br />C5-1 <br />Feb. 2008 <br />GRAND VALLEY poWER <br />G5 -1 <br />