Laserfiche WebLink
gN4pt1 <br />PACtftC" <br />10.07 Turnout Components - All turnout components shall be new or certified reconditioned material. All <br />turnout components in UP owned or maintained track shall be new material supplied by UP or a UP approved <br />vendor. The Industry and/or its Contractor need to provide verification that the tumout(s) are from a UP <br />approved vendor. <br />10.08 Turnout Assembly - The Industry and/or its Contractor need to verify with the Manager Track <br />Maintenance or the Manager Industry & Public Projects that the tumout(s) to be installed on the UP owned <br />portion of the track will be provided loose or assembled. Turnouts to be provided must meet provisions of the <br />local collective bargaining agreements. If the assembly of the Turnouts is by the Industry's Contractor, the <br />assembly in all cases must occur off of UP right of way. <br />46 <br />Heavy Traffic <br />>2000 cars per year <br />7" x 9" x 8'6 "" Ties rq.. 24 ties per 39' rail <br />19.5" centers <br />10.07 Turnout Components - All turnout components shall be new or certified reconditioned material. All <br />turnout components in UP owned or maintained track shall be new material supplied by UP or a UP approved <br />vendor. The Industry and/or its Contractor need to provide verification that the tumout(s) are from a UP <br />approved vendor. <br />10.08 Turnout Assembly - The Industry and/or its Contractor need to verify with the Manager Track <br />Maintenance or the Manager Industry & Public Projects that the tumout(s) to be installed on the UP owned <br />portion of the track will be provided loose or assembled. Turnouts to be provided must meet provisions of the <br />local collective bargaining agreements. If the assembly of the Turnouts is by the Industry's Contractor, the <br />assembly in all cases must occur off of UP right of way. <br />46 <br />