My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-07_PERMIT FILE - C2010088 (24)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010088
>
2012-03-07_PERMIT FILE - C2010088 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:54:49 PM
Creation date
3/8/2012 1:25:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Permit File
Doc Date
3/7/2012
Doc Name
Union Pacific Track Roadbed Construction Specifications
Section_Exhibit Name
Exhibit 16
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gN4pt1 <br />PACtftC" <br />10.07 Turnout Components - All turnout components shall be new or certified reconditioned material. All <br />turnout components in UP owned or maintained track shall be new material supplied by UP or a UP approved <br />vendor. The Industry and/or its Contractor need to provide verification that the tumout(s) are from a UP <br />approved vendor. <br />10.08 Turnout Assembly - The Industry and/or its Contractor need to verify with the Manager Track <br />Maintenance or the Manager Industry & Public Projects that the tumout(s) to be installed on the UP owned <br />portion of the track will be provided loose or assembled. Turnouts to be provided must meet provisions of the <br />local collective bargaining agreements. If the assembly of the Turnouts is by the Industry's Contractor, the <br />assembly in all cases must occur off of UP right of way. <br />46 <br />Heavy Traffic <br />>2000 cars per year <br />7" x 9" x 8'6 "" Ties rq.. 24 ties per 39' rail <br />19.5" centers <br />10.07 Turnout Components - All turnout components shall be new or certified reconditioned material. All <br />turnout components in UP owned or maintained track shall be new material supplied by UP or a UP approved <br />vendor. The Industry and/or its Contractor need to provide verification that the tumout(s) are from a UP <br />approved vendor. <br />10.08 Turnout Assembly - The Industry and/or its Contractor need to verify with the Manager Track <br />Maintenance or the Manager Industry & Public Projects that the tumout(s) to be installed on the UP owned <br />portion of the track will be provided loose or assembled. Turnouts to be provided must meet provisions of the <br />local collective bargaining agreements. If the assembly of the Turnouts is by the Industry's Contractor, the <br />assembly in all cases must occur off of UP right of way. <br />46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.