My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-07_PERMIT FILE - C2010088 (24)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010088
>
2012-03-07_PERMIT FILE - C2010088 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:54:49 PM
Creation date
3/8/2012 1:25:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Permit File
Doc Date
3/7/2012
Doc Name
Union Pacific Track Roadbed Construction Specifications
Section_Exhibit Name
Exhibit 16
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Access roads and parking areas which the Industry needs to construct on the UP's Right of Way or <br />property, which the UP has easement or interest in, shall be approved by the Engineer before such <br />roads or parking areas are built. All access roads and parking areas constructed by the Industry that <br />the Engineer deems unsuitable for future UP use shall be removed at Industry expense upon <br />completion of the Work. The areas shall be stabilized with gravel or put back to preexisting <br />conditions where required. <br />8.07 DUST CONTROL - Industry shall provide equipment for dust control during construction to <br />provide for the safety of UP personnel and UP operations. <br />8.08 CLEAN UP - Upon completion of work, the Industry shall clean the location of the Work and <br />all ground on UP property occupied by him in connection with the Work. The Industry shall remove <br />all rubbish; excess materials, temporary structures, and equipment, leaving the location of the Work <br />cleaned to the satisfaction of the Engineer. <br />8.09 ROADBED WIDTH - Roadbeds shall be constructed per UP's Engineering Standard <br />Drawing No. 0003. On UP owned or maintained tracks, a twenty four foot roadbed will be required. <br />Although a twenty -four foot roadbed is preferred, tracks not owned or maintained by UP may have a <br />twenty two foot roadbed (with permission of UP's Engineering Department). Additional roadbed <br />width will be required along all turnouts and derails to provide adequate room for placement of <br />walkways (see UP Exhibit `E' Drawing). <br />8.10 CONSTRUCTION PAD - Industry shall provide a construction pad adjacent to the location <br />where a turnout will be installed in UPRR track. The pad should be sufficiently sized to facilitate the <br />assembly and installation of the turnout. At the direction of the Manager Track Maintenance or MIPP, <br />the pad may have to be removed to facilitate proper drainage after the switch is installed. <br />Construction Pad details should be included with the Construction Plans (see UP Exhibit `T.O.PAD <br />Drawing). <br />8.11 CLEARING AND GRUBBING - Areas required for embankment or excavation shall be <br />cleared and grubbed. On areas required for excavation, all stumps, roots, etc., shall be removed to a <br />minimum depth of two feet (2') below the sub -grade elevation. On areas required for embankment, <br />all stumps, roots, etc., shall be removed to a minimum of two feet (2') below the existing ground. All <br />holes remaining after clearing and grubbing shall be backfilled and compacted and the entire area <br />bladed to provide drainage, except, in areas to be immediately excavated, the Engineer may direct <br />that the holes not be backfilled. On areas required for borrow sites and material sources, all stumps <br />and roots, (except for designated trees and shrubs) shall be removed to prevent such objectionable <br />matter becoming mixed with the material to be used in construction. <br />Areas requiring minimal grubbing, as designated by the Engineer, shall have a minimum of six inches <br />(6 ") of vegetation and topsoil removed from the construction area. <br />All cleared and grubbed material shall be either: <br />a) Stockpiled to be used as topsoil after grading is complete, if the Engineer has approved the <br />material for this use. <br />b) Properly disposed of in a manner satisfactory to the Engineer and in compliance with Federal, <br />State and Local regulations. <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.