FJPVA;-ICSN' <br />`. t <br />Pipe laying shall begin at the downstream end of the culvert. The bell or groove end of the pipe <br />shall be placed facing upstream. No culvert shall be placed in service until a suitable outlet is <br />provided. <br />8.22.10 BACKFILLING AND COMPACTION - Backfill materials shall be placed <br />simultaneously on both sides of the pipe culvert in uniform layers not exceeding six inches (6 ") in <br />thickness. For multiple pipes the backfill shall be placed simultaneously in uniform layers <br />between and outside of the pipes. Each successive layer shall be compacted to not less than 95% <br />(Modified Proctor) of maximum density as determined by ASTM D 1557, with moisture content <br />adjusted if necessary, and each six inch (6 ") layers shall be properly compacted before the next <br />layer is placed. <br />Backfilling shall be started and completed as quickly as possible after the pipe culvert has been <br />assembled and placed on its bed. <br />Special care must be taken to obtain adequate compaction under the pipe culvert haunches; <br />however, care must be exercised to avoid lifting of the pipe culvert as the result of tamping to <br />compact material under the haunches. Where pipe culvert is placed in a confined area, making it <br />difficult to obtain adequate compaction under the pipe culvert haunches through tamping, a <br />Controlled I,ow- Strength Material (CLSM) fill may be used, see UP Bridge Standard Plan No. <br />680000, Sheet 2 of 2 (this plan refers to steel pipe but the CLSM fill section shall also apply to <br />concrete pipe. All backfill material placed around and adjacent to pipe culverts to a point at least <br />one foot above the top of the pipe culvert shall consist of sand, gravel, sandy -clay, or a <br />combination thereof, free from all vegetation and rock or lumps greater than one and one -half <br />inches (1 -1/2 ") in diameter in their greatest dimension. Granular material containing a small <br />amount of silt or clay is an ideal backfill material because it makes a dense, stable fill. Where <br />granular material is used for backfill, the ends of the pipe culvert embankment shall be sealed <br />with well- tamped clay to prevent leaking and infiltration of water along the pipe culvert. <br />Materials used to complete the embankment over the pipe culvert should be essentially the same <br />as the materials used for the pipe culvert backfill and should be placed and compacted in the same <br />manner as pipe culvert backfill materials are placed. Such material must be used to complete the <br />embankment at least to a height over the top of the pipe culvert equal to the nominal diameter of <br />the pipe culvert, or if the height of the completed embankment over the top of the pipe culvert is <br />less than the nominal diameter of the pipe culvert, then such material must be used to complete <br />the embankment. The pipe culvert must be protected from damage during the entire construction <br />period, especially if heavy compaction and/or construction equipment is used. Heavy equipment <br />shall not be operated over the pipe culvert until it has been covered with compacted backfill <br />material to a depth of twenty -four inches (24 "). <br />Copies of all compaction tests shall be supplied to the Engineer. <br />8.22.11 REMOVAL OF EXISTING IIEADWALLS OR CULVERTS IN PREPARATION <br />FOR EXTENSION OF EXISTING PIPE CULVERTS - The Industry shall remove existing <br />headwalls and/or culverts in whole or in part as shown on the Drawings and in the Specifications. <br />The Industry shall perform all work called for, as shown on the Drawings and in the <br />Specifications, which may be necessary to adapt existing pipe culverts for extension or <br />reconstruction, including required excavation and backfilling. Except as otherwise provided for <br />39 <br />