Laserfiche WebLink
TRAIN LOADING <br />SYSTEM 4500 TPH <br />LOADING CAPACITY <br />48" RADIAL STACKER <br />CONVEYOR, 1500 TPH <br />143 DEGREES MAXIMUM <br />ROTATION <br />40,000 TON <br />STOCKPILE 48" STACKING <br />CONVEYOR 1500 TPH 96" CMP TUNNEL <br />120 CAR TRUCK DUMP <br />RAIL LOOP 30 TON HOPPER <br />1500 TPH <br />Mft=% <br />TRAIN LOADING <br />SYSTEM 4500 TPH <br />LOADING CAPACITY <br />MATERIAL <br />� STORAGE <br />F I <br />1 AREA <br />�. <br />R�r�cf�4ED <br />FEB 2 9 7017 <br />ulvi6ion o1 keciamavon, <br />Mining and Safety <br />ACCESS ROAD <br />48" RADIAL STACKER <br />CONVEYOR, 1500 TPH <br />143 DEGREES MAXIMUM <br />ROTATION <br />540 FPM 1500 TPH 'r/ 1 <br />SCALE: 1" = 100' A• c <br />TOPSOIL A <br />STOCKPILE AREA <br />�� <br />8,800 Y.D. CAP. 72" LOADING <br />72" LOADING CONVEYOR <br />4500 TPH <br />RECLAIM TUNNEL <br />EACH FEEDER = 10500 TONS TOTAL <br />4400 TONS LIVE <br />SECTION B — B' <br />696 FPM 4500 TPH <br />SCALE: 1" = 100' <br />LEGEND'. <br />R1PIII PERMITa NOARY <br />I l I <br />l l k RAILROAD <br />TOPSOIL STOCKVILE <br />MATERIAL STORAGE AREA ® COVEPHU STOCKPILE <br />COVE <br />STOCKPILE <br />15,000 Y.D. CAP. <br />RECLAIM TUNNEL <br />4400 TPH CAPACITY <br />EACH FEEDER <br />TON <br />a <br />CONVEYOR <br />1500 TPH <br />I her ',:.sy" at this dr C as e i <br />by or und�T my direct supeWigon a <br />tha of ti'infor smn¢i on is tY �, <br />dra g isi�e a�1 �FM0Rt�to t�epes[ <br />my wle"tlandD: S <br />amme Y?,. _ PF,• ••D��•.. ONEINCH <br />1 <br />TRUCK DUMP <br />30 TON HOPPER <br />1500 TPH <br />PLAN VIEW <br />SCALE: 1" = 100' <br />120 CAR <br />RAIL LOOP <br />CAM COLORADO LLC <br />2352 N. 7th Sireet, Unit B <br />Grand Junction, CO 81501 <br />Phone: 970 - 245 -2987 <br />e' ueo PV. STOVER A ASSOC <br />v <br />HANDLING FACILITIESI <br />DETAIL MAP <br />