My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-07_PERMIT FILE - C2010088A (19)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010088A
>
2012-03-07_PERMIT FILE - C2010088A (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:54:50 PM
Creation date
3/8/2012 8:14:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088A
IBM Index Class Name
Permit File
Doc Date
3/7/2012
Doc Name
Performance Bond Requirements
Section_Exhibit Name
Section 3.02
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd Task # 002 Page 3 of 3 <br />Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />Haul Route: <br />Road Condition: Firm. smooth, rolling, dirt/it surfaced. watered. <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade { %) Roll. Res <br />I M <br />Total Res <br />( %) <br />Velocity <br />{fpm) <br />Travel <br />Time <br />1 <br />1650.00 <br />0.00 3.00 - -^ <br />3.00 <br />2824 <br />0.688 <br />Haul Titres: 0.688 minutes <br />Return Route: <br />JOB TLME AND COST <br />Fleet size: I Team(s) <br />Unit cost: $2.955 /LCY <br />Total job time: 13.64 Hours <br />Total job cost: $9,294.79 <br />CIRCES Cost Estimating Software <br />Permit Application 3.02 -8 01/23/2012 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Production <br />277.78 LCYIHour Adjusted for job efficiency: <br />(Ft) <br />Truck Unit Production <br />(°J°) <br />( %) <br />(fpm) <br />Time <br />103.42 LCY/Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 310.27 <br />LCY/Hour <br />nlin <br />LCY/Hour <br />1 <br />1650.00 <br />0.00 <br />100 <br />3.00 <br />2874 <br />0.603 <br />JOB TLME AND COST <br />Fleet size: I Team(s) <br />Unit cost: $2.955 /LCY <br />Total job time: 13.64 Hours <br />Total job cost: $9,294.79 <br />CIRCES Cost Estimating Software <br />Permit Application 3.02 -8 01/23/2012 <br />Return Time: 0.603 <br />minutes <br />Total Truck Cycle Time: 3.792 <br />minutes <br />Loading Tool unit <br />Production <br />277.78 LCYIHour Adjusted for job efficiency: <br />230.56 LCY/Hour <br />Truck Unit Production <br />124.60 LCYIHour Adjusted for job efficiency: <br />103.42 LCY/Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 310.27 <br />LCY/Hour <br />Adjusted single truck/loader team production: 230.56 <br />LCY/Hour <br />Adjusted multiple trucktloader team production: 230.56 <br />LCY/Hour <br />JOB TLME AND COST <br />Fleet size: I Team(s) <br />Unit cost: $2.955 /LCY <br />Total job time: 13.64 Hours <br />Total job cost: $9,294.79 <br />CIRCES Cost Estimating Software <br />Permit Application 3.02 -8 01/23/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.