Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 076 <br />EQUIPMENT HAUL DISTANCE and Time <br />Page 2 of 2 <br />Nearest Major City or Town within project area region: ... GRAND JUNCTION <br />Total one-way travel distance: 175.00 miles <br />Average Travel Speed: 60.00 mph <br />Total Non-Roadable MoWDernob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost #1 <br />** one round trip, no haul rig: <br />130gMtion Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non-Roadable Roadable <br />Equipment Eauiument <br />2.92 <br />2.92 <br />2.92 <br />2.92 <br />1.50 <br />NA <br />1.50 <br />NA <br />8.83 T-5.83 <br />S24,304.70 <br />54,662.76 <br />Total job time: 17.67 Hours <br />Total job cost: 528,967.46 <br />CIRCES Cm Estirnoing Sollwam <br />Permit Application 3.02-58 01/23/2012 <br />