Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 075 <br />EOUIPMENT HAUL DISTANCE and rime <br />Page 2 of 2 <br />Nearest Major City or Town within project area region: GRAND JUNCTION <br />Total one -way travel distance: 25.00 miles <br />Average Travel Speed: 30.00 mph <br />Total Non- Roadable Mob/Demob Cost * <br />' * two round trips with haul rig: <br />Total Roadable Mob(Demob Cost ** <br />** one round trip, no haul rig: <br />TMU12ggation Cycle Tinte: <br />JOB TIME AND COST <br />Total job time: <br />Total job cost: <br />$4,564.61 <br />$466.70 <br />4.00 Hours <br />55,031,32 <br />CIRCES Cost Fmimating Software <br />Permit Application 3.02 -56 01/23/2012 <br />Non- Roadable <br />I <br />Roadable <br />Equipment <br />1 g uipment <br />Haul Time (Hours): <br />0.50 <br />0.50 <br />-1111. <br />-- ' <br />Return Time (Hours): <br />0.50 <br />0.30 <br />Loading Time (Hours): <br />0150 <br />NA <br />Unloading Time (Hours): <br />0.50 <br />NA <br />Subtotals: <br />2.00 <br />1.00 <br />JOB TIME AND COST <br />Total job time: <br />Total job cost: <br />$4,564.61 <br />$466.70 <br />4.00 Hours <br />55,031,32 <br />CIRCES Cost Fmimating Software <br />Permit Application 3.02 -56 01/23/2012 <br />