Laserfiche WebLink
Demo Worksheet Cont'd <br />36" Culvert Removal ! 8T — 2 LF <br />96" Culvert Over 70 LF <br />Loading Conveyor <br />Remove Bridge Over 150'x25' <br />Reed Wash <br />Clean -Up Material Assume <br />Storage Area <br />Assume <br />'task #t TIT <br />Pipe, corrugated metal <br />82.00 <br />(CMP) - 36 in. diameter <br />pipe _ <br />Pipe, reinforced concrete <br />70.00 <br />(RCP) - 96 im diameter <br />pipe <br />Bridge Removal - <br />3,750.00 <br />Means 32 34 20.101300 <br />Loading and 2 mile haul, <br />25.00 <br />no salvage - Machine <br />Job Hours: 400.00 Subtotal {unadjusted }: $336,896.98 <br />SF $19.18 <br />CX $15.10 <br />LF <br />Page 3 of 3 <br />$387.86 <br />$5,229.70 <br />71,925.00 <br />$377.50 <br />I <br />Total Cost <br />(adjusted for <br />location): 5307 6.94 <br />CIRCES Cost Estimating Software <br />Permit Application 3.02 -52 01/23/2012 <br />