Laserfiche WebLink
Page t of <br />TRUCK/LOADER TEAM WORK <br />Task description. Remove Fill from Reed Wash Bridge Area to Facilities Area <br />Site: Fruits Loadout Permit Action: New Permit Perrnit/Job#: C2010088 <br />PROJECT IDENTIFICATION <br />Task #: 048 State: Colorado <br />Date: 30 -Aug -I1 County: Mesa <br />User: JRS <br />Agency or organization name: DBMS <br />HOURLY EQUIPMENT COST <br />Equipment Description <br />Truck Loader Team - Truck: ' Generic 8- t 0 c , 6x4 <br />- Loader: Cat 330C L <br />I el <br />-Motor Grader. <br />-Water Truck: <br />Abbreviation: None <br />Filename: C088 -048 <br />Shift basis: I oer day <br />r..m. 'r-1,11 ned>. l ®n... C­ V# Maintvnanrr. Fnninment <br />Total work team cost/hour: $01.29 <br />MATERIAL OUANTITIES <br />Initial volume: 1,825 <br />Loose volume: 2,126 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />Material Purchase Cost: <br />Total Cost: <br />CCY Swell factor: 1.165 <br />LCY <br />Division of Reclamation, Mining & Safety; Map 21 <br />Cat Handbook <br />$0.00 <br />$0.00 <br />HOURLY PRODUCTION <br />Wit„,, achy_ <br />Tt cckk Payload (weightl Basis: <br />Material weight: 2,900 Pounds/LCY <br />Description: Decomposed rock - 50% stock, 500/6 Earth <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 9.41 LCY <br />CtRC IRS Cast Uirrmting Software <br />Permit Application 3.02 -33 01/23/2012 <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA 1 <br />100 <br />j 50 <br />100 <br />Ownershipcost/hour. <br />S9.28 <br />$37.65 <br />NA <br />$49.19 <br />$117.89 <br />518.09 <br />$22.04 <br />Operating costlhour. <br />$41.86 <br />$69.00 <br />NA <br />517.48 <br />$42.16 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost(hour: <br />$0.00 <br />$38.67 <br />NA <br />$38.49 <br />$38.49 <br />$38.70 <br />Unit Subtotals: <br />$51.14 <br />$14533 <br />NA <br />$205.56 <br />$74.07 <br />$102.90 <br />_ <br />Number of Units: <br />3 <br />1 <br />0 <br />1 <br />1 <br />_ 1 <br />Group Subtotals: <br />Work: 5298.75 <br />Support: $205.56 <br />Maint: $176.97 <br />Total work team cost/hour: $01.29 <br />MATERIAL OUANTITIES <br />Initial volume: 1,825 <br />Loose volume: 2,126 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />Material Purchase Cost: <br />Total Cost: <br />CCY Swell factor: 1.165 <br />LCY <br />Division of Reclamation, Mining & Safety; Map 21 <br />Cat Handbook <br />$0.00 <br />$0.00 <br />HOURLY PRODUCTION <br />Wit„,, achy_ <br />Tt cckk Payload (weightl Basis: <br />Material weight: 2,900 Pounds/LCY <br />Description: Decomposed rock - 50% stock, 500/6 Earth <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 9.41 LCY <br />CtRC IRS Cast Uirrmting Software <br />Permit Application 3.02 -33 01/23/2012 <br />