Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 045 Page 2 oft <br />Job Condition Correction factor <br />Operator Skull: <br />Material consistency: <br />Dozing method: <br />Visibility. <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.750 <br />(AVG. <br />0.900 <br />CAT HB <br />1.000 <br />GEN. <br />1.000 <br />AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.000 <br />(CAT HB) <br />11000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4443 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />552.35 LCY/hr <br />55235 LCY/hr <br />Fleet size: t Dozer(s) <br />Unit cast. S0.400ILCY <br />Total job time: 21.09 hours <br />Total job cost: $4,655.65 <br />CIRCES Cwt Estimating SoRwam <br />Permit Application 3.02 -28 01/23/2012 <br />