My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-07_PERMIT FILE - C2010088A (19)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010088A
>
2012-03-07_PERMIT FILE - C2010088A (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:54:50 PM
Creation date
3/8/2012 8:14:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088A
IBM Index Class Name
Permit File
Doc Date
3/7/2012
Doc Name
Performance Bond Requirements
Section_Exhibit Name
Section 3.02
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Page I of 2 <br />Regrade Light -Use Road #2 <br />Site: Fruita Loadout Permit Action: New Permit Permit/Job#: 02010088 <br />PROJECT IDENTIFICATION <br />Task #: 033 State: Colorado <br />Date: 30- Arl-11 County Mesa <br />User: JRS m _ <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9R - 9SU (2005) <br />Horsepower: 405 <br />Blade Type: Semi- Universal <br />Attachment; 1 -shank ripper <br />Shift Basis: 1 oer day <br />Data Source: (CRG <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: 0088 -033 <br />Total unit Cost/Hour.. $220.73 <br />Total f=leet Cost/Hour: $220,73 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,100 <br />Swell factor. 1.165 <br />Loose volume; 1,282 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety; Map 15 <br />Source of estimated swell factor. Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance. 150 feet <br />Unadjusted hourly production: 910.5 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0% <br />Average site attitude: 4,500 feet <br />Material weight: 2,900 lbs/t-CY <br />Weight description: Decom o�sed rock - 5001* hock, 500!6 Earth <br />CIRCES Cast Faximwing Software <br />Permit Application 3.02 -24 01/23/2012 <br />Utilization % <br />Ownership Cost/Hour: $58.82 <br />! NA <br />Operating Cost/Hour.. $11719 <br />— <br />too <br />Kipper op. Cost/Hour: $5.53 <br />50 <br />Operator Cost/Hour: $38.49 m <br />NA <br />Total unit Cost/Hour.. $220.73 <br />Total f=leet Cost/Hour: $220,73 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,100 <br />Swell factor. 1.165 <br />Loose volume; 1,282 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety; Map 15 <br />Source of estimated swell factor. Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance. 150 feet <br />Unadjusted hourly production: 910.5 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0% <br />Average site attitude: 4,500 feet <br />Material weight: 2,900 lbs/t-CY <br />Weight description: Decom o�sed rock - 5001* hock, 500!6 Earth <br />CIRCES Cast Faximwing Software <br />Permit Application 3.02 -24 01/23/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.