My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-07_PERMIT FILE - C2010088A (19)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010088A
>
2012-03-07_PERMIT FILE - C2010088A (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:54:50 PM
Creation date
3/8/2012 8:14:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088A
IBM Index Class Name
Permit File
Doc Date
3/7/2012
Doc Name
Performance Bond Requirements
Section_Exhibit Name
Section 3.02
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip Regraded Surfaces Prior to Topsoil Replacement <br />Site: Fruits Loadout Permit Action New Permit Permit/Job#: C2010088 <br />PROJECT IDENTIFICATION <br />Task #: 020 State: Colorado <br />Date: 30 -Aug 11 County: Mesa <br />User. IRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9R - 9SU (2005) <br />Ripper Attachment: 1 -Shank Ripper <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C08M20 <br />Horsepower: 405 — <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Utilization % <br />Ownership Cost/Hour: $58.82 NA <br />Operating Cost/Hour: $117.89 100 <br />Ripper Operating CostlHour. $11.07 100 <br />Operator CostlHour: $38A9 NA <br />Total Unit Co"our. $226.27 <br />Total Fleet CostlHour: $22617 <br />MATERIAL QUANTITIES Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA BCY NA <br />Area: t3 acres Rip Depth (ft): 2.00 Volume: 40,656 BCY or CCY <br />Source of estimated quantity: Operator Estimate, Map 9; Page 2.05 -32 <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />4.05 <br />mph <br />Average Ripping Width: <br />6.08 <br />degrees <br />Average Ripping Length: <br />200.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.664 <br />acresthour <br />,Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.664 <br />Acres/hr <br />Site Altitude: <br />4,500 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.55 <br />Acre&(hr <br />Adjusted Hourly Fiat Production: <br />0.55 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />22.86 Hours <br />Unit cost: $410.603 Per acre <br />Total job cost: <br />$5,174.00 <br />CIRCHS Cast F.,saimadng Software <br />Permit Application 3.02 -19 01/23/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.