My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-07_PERMIT FILE - C2010088A (19)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010088A
>
2012-03-07_PERMIT FILE - C2010088A (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:54:50 PM
Creation date
3/8/2012 8:14:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088A
IBM Index Class Name
Permit File
Doc Date
3/7/2012
Doc Name
Performance Bond Requirements
Section_Exhibit Name
Section 3.02
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY <br />Task description: Fruits Loadout New Permit Summary Sheet <br />Site: Fruita Loadout Permit Action: New Permit Permit/Job #: C2010088 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 8/30/2011 County: Mesa Filename: 0088 -000 <br />User: JRS <br />Agency or organization name: DRMS <br />015 Compact Backtilled and Regrai <br />020 ! Rip Regraded Surfaces Prior to <br />RPntarrment <br />021 <br />030 <br />031 <br />032 <br />033 <br />040 <br />045 <br />046 <br />047 <br />048 <br />049 <br />050 <br />055 <br />056 <br />060 <br />061 <br />063 <br />065 <br />070 <br />1 075 <br />COMPACT 1 75.65 $11.053.00 <br />RIPPER 1 22.86 $5.174.00 <br />Rip Haul Road #1, #2 and Access Road <br />Regrade Haul Road #1 <br />�Regrade Haul Road #2 <br />Regrade Access Road <br />i Regrade Light -Use Road #2 <br />Finish Grade Disturbed Areas Prior to Seeding <br />Regrade Pond 1 <br />} Regrade Pond 2 <br />Regrade Pond 3 <br />Remove Fill from Reed Wash Bridge Area to <br />Facilities Area <br />Reconstruct Reed Wash at Rail Bridge <br />r EE,de Ditches <br />TASK LIST (DIRECT COSTS) <br />1 <br />1 <br />1 <br />1 <br />; 1 <br />I 1 <br />' 1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />6.13 <br />$1.388.00 <br />$239.00 <br />$84.00 <br />$38.00 <br />$699.24 <br />$2.053.00 <br />$4,655.65 <br />$4,655.65 <br />$4.655.65 <br />$13,718.60 <br />$38,786.92 <br />$1.163.91 <br />$15,094.20 <br />$18,553.29 <br />$32.161.75 <br />$9.749.52 <br />$7.747.18 <br />$307.586.94 <br />$44.598.96 <br />$5,031.31 <br />2.59 <br />Task <br />. <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />[lours <br />Cost <br />001 <br />Remove Fill from Haul Road #1 and Place on <br />TRUCKI <br />1 <br />20.44 <br />$13,926.57 <br />':, Seed All Mine Areas Where Topsoil Was Replaced REVEGE 1 25.40 <br />Facilities Area <br />Weed Control - Spray Area 3 Times During REVEGE 1 102.30 <br />Liability Period <br />Demolish and Remove All Structures DEMOLISH 1 it 400.00 <br />Site Maintenance. Rill and Gully Repair and SAE NA I 1 168.00 <br />Repair s <br />j <br />Mobilize./Demobilize Equipment for Initial MOBILIZE 1 4.00 <br />Reclamation <br />13.64 <br />002 Remove Fill from Haul Road #2 and Place on <br />TRUCKI I 1 <br />$9,294.79 <br />Facilities Area <br />258.21 <br />003 Remove Fill from Rail Bed and Place on Facilities <br />TRUCKI 1 <br />$175.912.57 <br />Area <br />69.65 <br />004 Remove Material from Fill Pile and Place on <br />TRUCKI 1 <br />$47.448.44 <br />Facilities Area <br />8.84 <br />005 i Remove Coal Fines from Stockpile and Place in <br />TRUCK] :, 1 <br />$6.022.05 <br />Fill <br />1 <br />015 Compact Backtilled and Regrai <br />020 ! Rip Regraded Surfaces Prior to <br />RPntarrment <br />021 <br />030 <br />031 <br />032 <br />033 <br />040 <br />045 <br />046 <br />047 <br />048 <br />049 <br />050 <br />055 <br />056 <br />060 <br />061 <br />063 <br />065 <br />070 <br />1 075 <br />COMPACT 1 75.65 $11.053.00 <br />RIPPER 1 22.86 $5.174.00 <br />Rip Haul Road #1, #2 and Access Road <br />Regrade Haul Road #1 <br />�Regrade Haul Road #2 <br />Regrade Access Road <br />i Regrade Light -Use Road #2 <br />Finish Grade Disturbed Areas Prior to Seeding <br />Regrade Pond 1 <br />} Regrade Pond 2 <br />Regrade Pond 3 <br />Remove Fill from Reed Wash Bridge Area to <br />Facilities Area <br />Reconstruct Reed Wash at Rail Bridge <br />r EE,de Ditches <br />RIPPER <br />GRADER <br />? GRADER <br />GRADER <br />DOZER <br />GRADER <br />:.DOZER <br />DOZER <br />DOZER <br />TRUCKI <br />NA <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />; 1 <br />I 1 <br />' 1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />6.13 <br />$1.388.00 <br />$239.00 <br />$84.00 <br />$38.00 <br />$699.24 <br />$2.053.00 <br />$4,655.65 <br />$4,655.65 <br />$4.655.65 <br />$13,718.60 <br />$38,786.92 <br />$1.163.91 <br />$15,094.20 <br />$18,553.29 <br />$32.161.75 <br />$9.749.52 <br />$7.747.18 <br />$307.586.94 <br />$44.598.96 <br />$5,031.31 <br />2.59 <br />0.91 <br />E 0.41 <br />3.17 <br />22.33 <br />21.09 <br />21.09 <br />21.09 <br />j 20.14 <br />I <br />r121.22 <br />5.27 <br />1 Replace Topsoil from Stockpile I to Light -Use TRUCKI 1 2116 <br />Road and Rail <br />! Replace Topsoil from Stockpile 2 to Rail Loop TRUCKI 1 1 ! 27.23 <br />':, Seed All Mine Areas Where Topsoil Was Replaced REVEGE 1 25.40 <br />I Hydroseed Reconstructed Reed Wash Bridge Area REVEGE 1 4.00 <br />Weed Control - Spray Area 3 Times During REVEGE 1 102.30 <br />Liability Period <br />Demolish and Remove All Structures DEMOLISH 1 it 400.00 <br />Site Maintenance. Rill and Gully Repair and SAE NA I 1 168.00 <br />Repair s <br />j <br />Mobilize./Demobilize Equipment for Initial MOBILIZE 1 4.00 <br />Reclamation <br />Permit Application 3.02 -1 01/23/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.