Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 004 Page 3 of 3 <br />Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />14siol Rnntr- <br />Road Condition: Firm. smooth. rolling. dirt/lt. surfaced, watered, <br />Seg # <br />Haul Distance <br />Grade ( %j <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />(Ft) <br />Production <br />( %) <br />( %) <br />(fpm) <br />Time <br />(fpm) <br />Time <br />147.79 LCY/Hour Adjusted for job efficiency. <br />122.67 LCY/Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />mtn <br />1 <br />1000.00 <br />0.00 <br />_ <br />3.00— <br />3.00 <br />2824 <br />0.458 <br />Haul Time: 0.458 minutes <br />Return Route: <br />JOB TIME AND COST <br />Fleet size: t Team(s) <br />Unit cost: 52315 ILCY <br />Total job time: 69.65 Hours <br />Total job cost: $47,448.44 <br />CIRCES Cart Estimating Software <br />Permit Application 3.02 -14 01/23/2012 <br />Seg # <br />Haul Distance <br />Grade ( °fo) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Production <br />(Ft) <br />250.91 LCY/Hour <br />( %) <br />( %) <br />(fpm) <br />Time <br />147.79 LCY/Hour Adjusted for job efficiency. <br />122.67 LCY/Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 368.01 <br />min <br />1 <br />1000.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />0.376 <br />JOB TIME AND COST <br />Fleet size: t Team(s) <br />Unit cost: 52315 ILCY <br />Total job time: 69.65 Hours <br />Total job cost: $47,448.44 <br />CIRCES Cart Estimating Software <br />Permit Application 3.02 -14 01/23/2012 <br />Return Time: 0.376 <br />minutes <br />Total Truck Cycle Time: 3.197 <br />minutes <br />Loading Tool trait <br />Production <br />302.30 LCY/Hour Adjusted far job efficiency: <br />250.91 LCY/Hour <br />Truck Unit Production <br />147.79 LCY/Hour Adjusted for job efficiency. <br />122.67 LCY/Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 368.01 <br />LCY/Hour <br />Adjusted single truck/loader team production: 25091 <br />LCY /Hour <br />Adjusted multiple truck/loader team production: 250.91 <br />— LCY/Hour <br />JOB TIME AND COST <br />Fleet size: t Team(s) <br />Unit cost: 52315 ILCY <br />Total job time: 69.65 Hours <br />Total job cost: $47,448.44 <br />CIRCES Cart Estimating Software <br />Permit Application 3.02 -14 01/23/2012 <br />