Laserfiche WebLink
2.03.8 Permit Term Information <br />(1) Surface mining activities (open pit or strip mining) are not planned within the <br />permit area. <br />(2) The construction of the surface facilities is anticipated in 2012. Approximately <br />38.1 acres will be affected and disturbed during the life of the operation. <br />Since no underground mining will take place, affected and disturbed acreage <br />will be the same. <br />(3) The Applicant will conduct loadout operations in excess of 5 years. The <br />applicant requests a permit term of five years. <br />Permit Application 2.03 -8 08/11 <br />