Laserfiche WebLink
<br />• <br />• <br />This insurance protects the Contractor against his legal liability to third persons for bodily injury and property <br />damage arising out of his own operations. This cost has been estimated at 1.55 percent of the direct costs. <br />Contractors Performance Bond <br />The performance bond guarantees the contract will be performed and the reclamation will be conducted to <br />the satisfaction of the Division. This cost has teen estimated at 1.05 percent of the direct costs. <br />COST SUMMARY <br />The revised bond estimate demonstrates that the entire permit area rsn be reclaimed for 59,517,161. <br />The Division currently holds 59,707,373 in bond. <br />PROS <br />Revised 4106 <br />